Products
Hybrid plastic runway
The thickness of the hybrid plastic runway surface layer is 13mm, which has good weather resistance, wear resistance, good elasticity, nail resistance, and strong anti-aging ability. The surface layer is constructed by high-pressure spraying. The hybrid p
Description

The thickness of the hybrid plastic runway surface layer is 13mm, which has good weather resistance, wear resistance, good elasticity, nail resistance, and strong anti-aging ability. The surface layer is constructed by high-pressure spraying. The hybrid plastic runway is cost-effective and affordable.
Compared with sports venues such as cinder track, hybrid plastic track sports venues have beautiful colors, clean venues, easy maintenance and management, and are not affected by climate and other conditions. The mixed plastic track is a flat and even field, which can absorb shock and bounce freely. If an athlete falls, it can reduce or reduce the degree of injury. The bright and beautiful colors of the venue give the sports field a sense of comfort and excitement. In addition, the venue is flat, non-slip, elastic, and the hardness of the venue is properly adjusted, which helps athletes to play or improve their performance.
Scope of application
The hybrid plastic track sports field is suitable for domestic and international track and field competition venues, training venues, and various school competitions and teaching venues.

Product Features
All-weather use, any season and temperature difference, can maintain a high level of quality, can be used immediately after rain, increase the utilization time and improve the site utilization rate. Elasticity: It has moderate elasticity and resilience, which can reduce physical consumption and improve competition performance.
Impact resistance: moderately absorb foot impact, reduce sports injuries, suitable for long-term practice and competition.
Weather resistance: It will not fade, chalk or soften due to the pollution of ultraviolet rays, ozone, acid rain, and can maintain its bright color for a long time. Wear resistance: Wear resistance is less than 2.5%, which meets the needs of schools at all levels for a long time and high frequency of use.
Compression resistance: No elasticity can be lost due to the heavy pressure of track and field equipment.
Nail resistance: At the 100-meter starting point where the force is the largest and most frequently used, it will not be damaged by spikes or the starting frame. Impact resistance: It has a strong elastic layer and a buffer layer, which can absorb strong impact and the surface will not be damaged. Flatness: Self-leveling materials are used during construction, and the surface is flat, which can meet the requirements of particularly flat competition venues. Adhesion; special construction treatment, strong adhesion, can suppress the rise of water, without foaming, peeling and other phenomena. Safety: Prevents sports injuries from falls.
Economy: easy maintenance, saving management costs.
Color: Special high-elasticity EPDM particles, the surface color is soft, the granular surface layer prevents the reflection of dazzling light, beautiful and durable, and can be matched with multiple colors.

Construction points
Use theodolite or total station to locate and pay out the line. First put the two-component primer into the mixing tank according to the material ratio of 1:5 and stir evenly, and then add an appropriate amount of drier, the recommended amount is 4%. Evenly, finally pour the required proportion of environmental protection particles, then stir evenly, pour into the construction area, and use a scraper or a scraper to scrape it according to the design height. First put the 1:1 two-component dough glue into the mixing bucket and stir evenly, then add an appropriate amount of drier, the recommended amount is 4%, stir evenly, and finally pour in the required ratio of EPDM color particles, and then stir evenly, The two-component topcoat and the dosage is 1.3Kg/m2, then put into the spraying machine, sprayed evenly on the primer layer, and sprayed twice. Lines can be drawn the next day after the two floors are all constructed.
Line drawing requirements: Using the identified steel ruler, the total station shall set out and draw lines in accordance with the International National Athletics (IAAF) standards, the track and field marking specifications and the requirements of sports technology.


Message
If you have any suggestions or question for us.Please contact us.
















