Breathable plastic runway

Product introduction
The bottom layer of the breathable plastic track is a combination of one-component glue and elastic rubber particles, which is an environmentally friendly product and has a breathable function. At high temperatures, the steam generat
INQUIRY
Description




Product introduction

The bottom layer of the breathable plastic track is a combination of one-component glue and elastic rubber particles, which is an environmentally friendly product and has a breathable function. At high temperatures, the steam generated by the foundation will be quickly dissipated. The steam pressure cannot be gathered, so there is no bubbling phenomenon, and it meets the requirements and has good elasticity.

Scope of application

It is suitable for domestic and international track and field competition venues, training venues, and various school competitions and teaching venues.

Features

1. The surface layer is made of EPDM rubber particles, making it highly resistant to ultraviolet rays. Practice has proved that it has no fading and is strong and wear-resistant. 2. The EPDM rubber particles on the surface layer are mixed with the two-component environmental protection surface glue, and then the construction is carried out by mechanical spraying. 3. Weather resistance, not easy to age.

4. The elasticity is stable, there is no difference in elasticity throughout the year, and it will not be hard in winter and soft in summer.

5. Powerful rotation and strong shock absorption, emphasizing the comfort and safety of athletes, and helping athletes to play or improve their performance. 6. Emphasize the overall performance of the track, adapt to various events and long-term competition training.

7. The painting line is not easy to fall off the paint, the color is bright, it does not fade, and the wear resistance is better.

8. The flatness reaches the IAAF standard, and the water filtration is good. There is no need to stop the competition in light rain, and the competition can be played immediately after heavy rain, and there will be no accumulation of water. 9. The production process is simple and the construction period is relatively short.

10. Beautiful colors, clean and easy to maintain.


construction process

First clean the site; if there are many uneven foundations, water accumulation and crushing, the runway can be back-sealed with emulsion, quartz sand and cement; after cleaning, the entire site is leveled, and drainage is ensured through the technical on-site guidance of the basic engineer. The system is open. After the road surface does not have water accumulation, the plastic surface layer can guarantee the quality for a long time. The runway can be laid after the foundation is made.

construction technology

The surface of the asphalt foundation is uniform and firm, with no oil stains, no hemp surface, smooth and smooth joints without cracks, no rotten edges, no water blocking phenomenon, compaction density ≥95%, flatness 3m, straightedge error ≤3mm. The natural curing of the new asphalt foundation is ≥15 days, and the asphalt experience requirement is ≤ACO5. The site should be thoroughly rinsed before construction. The cement foundation is smooth and free of stagnant water.

construction steps

1. Mix the single-component glue and the primer particles according to the specified proportion, fully mix them with a mixer, transport them to the paving site, and use a paver to pave according to the specified thickness; strictly control the paving according to the site environment and temperature conditions. Speed ​​and angle to ensure that the bottom layer of the paving is dense and flat. After curing, it becomes the bottom layer.

2. Use the breathable spray surface glue, EPDM rubber particles and EPDM rubber powder in the prescribed proportion, stir evenly, pour it into the special spraying machine, and spray it in two to three times in the clockwise and counterclockwise directions. After curing And as a non-slip and wear-resistant layer, the commonly used color is red. Lines can be drawn the next day after the two floors are all constructed. Pay attention to the environmental protection work around the spray surface, and cover it with plastic cloth if necessary.

3. Line drawing requirements: Use the identified steel ruler and the total station to set out and draw lines in accordance with the International Athletics  (IAAF) standards, the track and field marking specifications and the requirements of sports technology.

4. Acceptance standard: Acceptance according to the standard.