EPDM plastic tennis court

The advantages of EPDM plastic tennis court
All-weather use: In any season and temperature, it can maintain a high level of quality, and the outdoor plastic tennis court can be used immediately after rain, increasing the utilization time and improving th
INQUIRY
Description




The advantages of EPDM plastic tennis court
All-weather use: In any season and temperature, it can maintain a high level of quality, and the outdoor plastic tennis court can be used immediately after rain, increasing the utilization time and improving the utilization rate of the venue.
Elasticity: With moderate elasticity and rebound, it can reduce physical consumption and improve competition performance.
Impact force absorption: Appropriately absorb the impact force of the foot to reduce sports injuries, suitable for long-term practice and competition.
Weather resistance: It will not fade, chalk or soften due to the pollution of ultraviolet rays, ozone and acid rain, and can maintain its bright color for a long time.
Wear resistance: The wear resistance is less than 2.5%, which meets the needs of long-term and high frequency of use.
Compression Resistance: Will not lose elasticity due to heavy pressure.
Impact resistance: with strong elastic layer and buffer layer,



Construction steps of EPDM plastic tennis court

1. Site cleaning
Cleaning the ground: Clean the base ground as a whole. If there are local roughness or parts that are not suitable for construction, it needs to be partially polished. After cleaning, go to the next step.

2. Draw a baseline or pattern boundary
According to the requirements of the design drawings, measure the size of the entire site, set out the lines according to the regulations of the drawings, and use titanium dioxide or marker to draw a clear bottom line as a reference line for subsequent construction. After the bottom line is drawn, it should be checked carefully, and different colors should be marked in different areas to prevent mistakes in subsequent construction. After the inspection is completed, it should be reviewed and confirmed with the customer, and the subsequent construction should be carried out after confirmation.

3. Roll primer
In order to strengthen the adhesion between the plastic floor and the base layer, it is necessary to roll a layer of primer on the base layer during construction. The recommended dosage of roller primer is 0.1-0.2KG glue per square. Use a roller to apply the glue evenly on the base surface, and roll it while applying, without waiting for the glue to cure.
If the ground is drawn with a baseline, you need to be careful not to erase the baseline. For key areas such as edges, corners, and corners, care should be taken not to cause pollution. For the area on the edge of the venue, you can apply a little more primer to the area to strengthen the edge of the plastic floor.
When applying primer, you need to pay attention to it. The primer can fully wet the base surface. Do not apply too much. Otherwise, it will cause foaming of the plastic floor, which will affect the appearance and quality. If the primer is too much, you can use a roller to dip it into other areas, or sprinkle a little dry EPDM particles.

4. Preparation of construction materials
Arrange the EPDM particles in piles according to the color. Generally, it is recommended to stir 3 packets of materials once at a time. Pour the materials into the mixer (if the quantity is small, manually stir), and stir for 1 minute to make the materials fully mixed. Reduce chromatic aberration. After the materials are mixed, pour the glue. The glue needs to be weighed every time it is used, and the construction is carried out according to the proportion. The glue should not be too much or too little. If the amount of glue is not enough, it will affect the adhesion of the plastic floor; if the amount of glue is too much, it will cause the plastic floor to foam, affecting the appearance and quality.
When mixing the materials, be sure to stir evenly, and there should be no lumps of materials. If the temperature is low in winter, the glue is thick, and the glue can be heated at this time to facilitate construction. Heating the glue has no effect on the quality of the project.
After the material is mixed, it is transported to the area that needs to be constructed by bags or carts, waiting for the next step.
Materials of different colors should be constructed separately. After finishing one color, make another color to reduce the accidental occurrence of material color mixing. All tools and machinery should be cleaned every time the color is changed.

5. Material paving and surface finishing
Use a shovel to spread the material over the area to be paved and smooth it out with a spatula.
After the material is scraped, the surface layer finishing operation is required. The light can be collected manually or mechanically, both of which have no effect on the quality. Generally, when the area is large, mechanical light collection is used, and when the area is small, artificial light collection is used. Lighting should be carried out by professional construction personnel. Lighting is the most important step, which directly affects the appearance and quality of the finished plastic floor.
After receiving the light, attention should be paid to protection. Generally, it needs to be protected for 12 hours in summer and 2 to 3 days in winter. During the protection period, no marking construction can be carried out, and no one can step on it, otherwise it will cause damage to the ground, and generally it is not easy to maintain. After maintenance, it may leave traces and affect the appearance, so it must be well protected.

6. Scribe
Measure and position according to the drawing design, mark the position of the boundary line, stick it on the court along both sides of the boundary line with masking paper (or transparent tape), and apply special scribing paint between the masking papers. After the surface is dry, tear off the masking paper. . Before construction, it is necessary to confirm the size with the customer, and then proceed to construction after confirmation.

7. Finished product protection
After the marking is completed, the construction of the stadium is completed. At this time, the finished product needs to be protected. Generally, it needs to be placed for about 1 week to ensure the complete curing of the entire stadium. The site shall not be open to the public during the protection period of the finished product.